| |
| The ZWR intermediate regenerator |
![]() | Usage of the intermediate regenerator ZWR is possible for maintenance of a gemination of distance of a system PCM 11A and PCM 5D. ZWR is follow-up provided with remote voltage from a module of remote voltage FSP through the second double lode. In the intermediate regenerator ZWR the opening-up of signals of the user and submission of a distant feed for PCM 11TA and PCM 5TD implements. The regenerator is set in the system unit for ZWR (the installation up to three modules simultaneously) is possible, which one is placed or in an earthed funnel, or in a test hut (KVZ). The example of application of the regenerator feed ZWR is rotined in the description of systems PCM11A/PCM5D. | ![]() |
| The FSP module of remote pressure |
| The module of a distant feed is established of the device, above relating it, PCM 11VA and PCM 5VD and is provided with voltage through the connecting terminal FSP, and on the causes of safety is established and the FSP-module is hooked up at first, but only the submarine cable for an energizing of a power or to adjacent FSP - module, or to the connecting terminal is then hooked up. FSP to fasten on the system unit BGT is concrete above that module РСМ, with which one he works. | |
|
|
|